A SIPOC is a one-page table with five columns, Suppliers, Inputs, Process, Outputs and Customers, that shows where a process starts and ends, what goes into it and who receives what comes out. You fill it in before you improve anything, so the team agrees on the scope first. It takes under an hour and saves the common argument, three weeks into a project, about what "the process" was supposed to include.
Suppliers → Inputs → Process (5 to 7 steps) → Outputs → Customers
Where it is used
SIPOC is a standard first step in improvement projects, and it is part of the Define phase in Six Sigma's DMAIC method. It is just as useful on its own: before a kaizen event, at the start of an A3, when you take over an area you don't know, or whenever people disagree about where one department's job ends and the next one's begins.
The five columns
- Suppliers: who or what provides the inputs. Outside vendors, but also other departments, the previous shift and the computer system.
- Inputs: what the process needs to run: material, information, equipment, people.
- Process: the main steps, written as verbs, from a named start to a named end. High level only.
- Outputs: what the process produces. The product, but also records, reports and waste.
- Customers: who receives each output. Usually the next step inside the building, not only the paying customer.
How to fill one in
The order matters. Start in the middle, not with S.
- Name the start and the end. One sentence each: "Starts when the truck is at the dock door. Ends when the stock is in its location and visible in the system."
- Write the process steps. Five to seven, as verbs. If you need more, you are either mapping in too much detail or describing two processes.
- List the outputs of those steps.
- Name the customer for each output.
- List the inputs the steps need.
- Name the supplier of each input.
Do it with the people who run the process, on a whiteboard or a sheet of paper with five columns drawn on it. If a customer can join, even for ten minutes, ask what they need from each output: on time, the right count, the right label. That turns the SIPOC into a list of what "good" means.
A worked example
This example is invented for illustration: the receiving process in a small warehouse. The team agreed it starts with the truck at the dock door and ends with the stock in its location and visible in the system.
| Column | What the team wrote |
|---|---|
| Suppliers | Carriers; vendors; purchasing, who raise the purchase orders |
| Inputs | The delivery; the packing list; the purchase order in the system; a free dock door, a forklift and a driver |
| Process | 1. Unload the truck. 2. Count and check against the purchase order. 3. Inspect for damage. 4. Receive in the system and label. 5. Put away to the location. |
| Outputs | Stock in its location; a receipt in the system; a signed delivery note; a damage or shortage report when needed |
| Customers | Pickers; purchasing and accounts payable; the carrier, who takes the signed note; production planning |
The numbers in the process row are only the order of the five steps.
Filling it in surfaced two things before anyone had timed a single step. First, on busy days step 5 happened before step 4: stock went to the rack before it was received in the system, so it was physically there but invisible to the pickers. Writing the end point as "visible in the system" made that a gap in the process, not a matter of opinion. Second, some deliveries arrived without a packing list. That is a supplier input problem, outside receiving's control, so it became a conversation between purchasing and those vendors instead of a target for the receiving team.
What comes after it
A SIPOC tells you what to look at. It doesn't tell you where the time goes. Next steps usually are:
- Walk the process from start to end on a gemba walk.
- Draw the walking and travel with a spaghetti diagram.
- Time the steps with a time study, and compare cycle time and lead time.
- Work out how much of the lead time adds value with process cycle efficiency.
- Look for the eight wastes inside each step.
Common mistakes
- Too much detail. Twenty steps is a process map, not a SIPOC. Keep the middle column to five to seven.
- Starting with suppliers. You end up listing everyone you buy from, most of whom don't matter to this process.
- No start and end point. Without them, the scope drifts and the SIPOC can't settle the argument it was meant to settle.
- Departments instead of outputs. "Purchasing" is not an output. "A receipt that matches the purchase order" is.
- Forgetting internal customers. The pickers and the next shift are customers too, and usually the ones who feel a problem first.
- Treating it as the improvement. It is the scope of the work, not the work.
SIPOC in Lean Day Toolkit
Lean Day Toolkit has a Diagram tool under Tools, with a SIPOC
template among its starter drawings, described in the app as Scope it before you fix it:
supplier to customer.
The
template has the five columns ready, with a note to fill the middle column first, five to seven
steps. The
same tool has process-flow and spaghetti templates for the next step. Drawings
stay on your phone, and
the Diagram tool is in the full version.