A spaghetti diagram is a plan of a work area with a line drawn for every trip one person makes while they do the job. When you measure the lines, the walking turns into feet and minutes you can cut, usually by moving things closer to where they are used. The name comes from what the drawing usually looks like the first time: a plate of spaghetti.
Feet walked per hour = sum of (round-trip distance × trips per hour)
Why walking is worth measuring
Walking is motion, one of the eight wastes. It is easy to miss because the person walking looks busy, and the trips are short. One 60-foot trip doesn't look like waste. Twelve of them an hour, every hour, add up to miles over a shift. A spaghetti diagram puts the whole day's walking on one sheet of paper.
How to draw one
- Sketch the area. A rough plan is enough: benches, racks, machines, doors, the printer. It doesn't need to be to scale, because you will measure the distances.
- Pick one person and one job. Follow the work, not the area. Tell them what you are doing and why: you are looking at the layout, not at them.
- Draw every trip as it happens. Put your pencil on the plan where they start and follow them, one continuous line, for a set time. An hour, or a set number of cycles, is enough to see the pattern. Make a tally mark each time a trip repeats.
- Note why each trip happened. "Fetch label", "find tape gun", "take carton to dispatch". The reason is what you will fix.
- Measure the distances. Use a measuring wheel or tape, or pace it out. If you pace, measure your own stride over 50 feet first rather than guessing it.
- Time the walking. A stopwatch on the walking alone gives you the minutes. A time study of the full cycle shows the walking as a share of the job.
A worked example
This is an illustration: one packer at a pack bench in a warehouse, with five racks, a label printer and a dispatch area. We watched for one hour, during which the packer packed 12 orders.
Before
Each row is one kind of trip. The round trip is twice the one-way distance, and the last column is the round trip multiplied by the trips in the hour.
| Trip | One way (ft) | Round trip (ft) | Trips per hour | Feet per hour |
|---|---|---|---|---|
| Bench to printer, for the label | 30 | 60 | 12, one per order | 720 |
| Bench to rack 5, for a box and tape | 40 | 80 | 12, one per order | 960 |
| Bench to dispatch, with the carton | 25 | 50 | 12, one per order | 600 |
| Bench to rack 3, looking for the tape gun | 35 | 70 | 2 | 140 |
| Total | 2,420 |
The total is 720 + 960 + 600 + 140 = 2,420 feet in one hour. The stopwatch put the walking at about 10 minutes of that hour, which is 2,420 feet in 600 seconds, or about 4 feet a second.
Over a working day of 7.5 hours, that is 2,420 × 7.5 = 18,150 feet. A mile is 5,280 feet, so 18,150 ÷ 5,280 = 3.4 miles, and 10 × 7.5 = 75 minutes of walking a day.
The changes
- Printer: moved to the end of the bench, 5 feet away.
- Boxes and tape: a shelf at the bench holds about an hour's worth, restocked from rack 5 once an hour.
- Tape gun: a marked place on a shadow board at the bench, so nobody has to look for it.
- Dispatch: left where it is, because three benches share it. Not every trip can go, and that's fine.
After
| Trip | One way (ft) | Round trip (ft) | Trips per hour | Feet per hour |
|---|---|---|---|---|
| Bench to printer | 5 | 10 | 12 | 120 |
| Restock from rack 5 | 40 | 80 | 1 | 80 |
| Bench to dispatch | 25 | 50 | 12 | 600 |
| Looking for the tape gun | none | none | 0 | 0 |
| Total | 800 |
The total is 120 + 80 + 600 + 0 = 800 feet an hour. That saves 2,420 − 800 = 1,620 feet, and 1,620 ÷ 2,420 = 67%, so about two-thirds of the walking is gone.
At the same 4 feet a second, 800 feet takes 200 seconds, about 3.3 minutes, so the hour gets back roughly 10 − 3.3 = 6.7 minutes. Over 7.5 hours that is 6.7 × 7.5 = about 50 minutes a day, and the day's walk drops from 3.4 miles to 800 × 7.5 = 6,000 feet, or 1.1 miles.
Those after-figures are an estimate until you check them. Draw a new diagram and time the walking again after a week, then put the two drawings side by side, which works well on a before-and-after sheet.
Fixes that usually work
- Point of use. Keep what is used every cycle within arm's reach, and keep what is used once a shift a short walk away.
- A home for every tool. Searching trips disappear when everything has a marked place. This is the "set in order" step of 5S, and a 5S audit checks that it holds.
- Bring the supply to the worker. One planned restock trip an hour beats twelve small ones.
- Follow the sequence. Lay the area out in the order the job is done, so the walking goes forward and doesn't double back.
Common mistakes
- Drawing from memory. The diagram you draw in the office shows the walking people remember. Stand on the floor and draw what actually happens, ideally as part of a gemba walk.
- Watching an unusual hour. A stock count or a breakdown changes the pattern. Watch a normal hour, or watch two and compare them.
- Blaming the walker. The layout sends people walking, so the fix belongs to the layout.
- Moving everything at once. Make the changes that remove the most feet first, and measure again before you do the rest.
Spaghetti diagrams in Lean Day Toolkit
Lean Day Toolkit has a diagram editor under Tools → Diagram, in the full version of the app. One of its starting templates is Spaghetti, "a floor to draw the walking on, then count it": a floor with five racks, a pack bench, a printer and dispatch already placed, ready to change to match your own area. To time the walking, the stopwatch (quick time study) is one of the tools that stays free. Walking you spot can go into the waste log, under Floor → Log waste, which is in the full version.