An andon is a signal that anyone on the floor can use to say "I have a problem here and need help now", together with an agreed response: who comes, how fast, and what happens if they can't fix it. The light, cord or card is the easy part. The response is what makes it work, because people only keep calling for help if help keeps coming.
Problem spotted → signal → responder arrives → fix or contain → escalate if needed → log it
Where it comes from
Andon is Japanese for a paper lantern. In the Toyota Production System it belongs to jidoka: the principle that work stops at an abnormality instead of passing it down the line. On Toyota assembly lines, a team member who finds a problem pulls a cord, a team leader comes to help, and if the problem can't be cleared in time, the line stops. The reasoning is simple: a problem caught at the station where it happened costs less than one found at the end of the line, or by the customer.
You don't need a moving assembly line or a light tower to use the idea. A packing bench, a machine cell or a warehouse aisle can all run an andon with a colored card and a clear rule.
Set it up in four parts
1. The trigger: what counts as a call
Agree what anyone should call for. A short list works: parts or material short, a quality doubt about a part, a tool or machine problem, falling behind the hour-by-hour plan, and a safety concern. Make it clear that calling early is right. A call about a part that turns out fine costs a minute. A doubt nobody raised can cost a shipment.
2. The signal
Anything the responder will notice from where they normally work: a light on the station, a cord, a button, a colored card or flag, a radio call. Many sites use a simple color scheme, such as green for running, yellow for help needed and red for stopped. Pick yours, write it down and keep it the same across the area.
3. The response
Name the responder for each area and shift, and set a response time. When they arrive, their job is to see the problem, help fix it, and contain anything suspect, not to ask why the call was made.
4. Escalation
Decide what happens when the first responder can't clear it: who is next, and after how long. Without this, a call that the team leader can't fix just turns into a long wait.
An example response standard
Here is an example for a four-station assembly cell with one team leader. The times are an illustration; set yours by how long your own line can stand still.
| Level | Who | When | What they do |
|---|---|---|---|
| 1 | Operator | The moment the problem is seen | Signals, holds the suspect part, stops if it is unsafe to continue |
| 2 | Team leader | Arrives within 2 minutes | Sees it, helps fix it, contains suspect parts |
| 3 | Supervisor | If not cleared 10 minutes after the call | Changes the plan if needed, calls maintenance or quality |
| 4 | Maintenance or quality | When the supervisor calls them | Repairs the machine or decides on the parts |
The 2 minutes is a walking distance and attention question: the team leader covers four stations close together and can reach any of them in well under that. The 10 minutes is the point at which, in this example cell, the hour's output target is at risk and someone with more authority needs to decide. Write the standard on one page and put it up at the cell.
Log every call and review it
Every call is a piece of data. Write down the time, the station, the reason, how long the responder took to arrive and how long until the problem was cleared. A sheet on a clipboard is enough. Any stoppage it caused belongs in your downtime log.
Here is an example week from the same invented cell:
| Reason for the call | Calls |
|---|---|
| Parts short | 9 |
| Tool or fixture problem | 6 |
| Quality question | 5 |
| Other | 3 |
| Total | 23 |
Each number is the count of calls for that reason in the week, from the log; 9 + 6 + 5 + 3 = 23. Of the 23 calls, 19 were answered within 2 minutes, which is 83% (19 ÷ 23 = 0.83). The other 4 (23 − 19) were all on the night shift, when the team leader also covered a second cell.
Two things come out of that week. Parts shortages are the biggest reason, 9 of 23 calls or about 39% (9 ÷ 23 = 0.39), so the next improvement is about how material reaches the cell, not about the operators. And the night shift response time is a staffing question for the supervisor. A Pareto chart of the reasons, updated weekly, makes this easy to see, and the weekly review is the place to look at it.
How to keep people using it
- Answer every call. If nobody comes, people stop calling and go back to working around problems quietly.
- Thank the caller. Every time, including when it turns out to be nothing. The first reaction to a call teaches the whole team whether calling is safe.
- No blame. Ask what in the process caused it, as you would in a 5 Whys.
- Don't target fewer calls. In the early weeks, more calls usually means problems are being seen, not that things got worse. Reduce calls by fixing their causes.
- Make responding part of the job. Put it in the team leader's standard work, and talk about open calls at the shift handover.
What an andon is not
An andon is not an emergency stop and does not replace one. Emergency stops, guarding and your emergency procedures stay exactly as they are; if someone is hurt, follow those. An andon is for the ordinary problems of the day. Safety concerns that didn't hurt anyone are still worth a call, and worth writing up as a near miss.
Start small
Try it in one cell for two weeks with the simplest signal you have, a colored card on each station. Review the log at the end, fix the response time or the escalation rule if they didn't work, and only then spread it.
Andon and Lean Day Toolkit
Lean Day Toolkit doesn't run an andon signal or a call
button. Andon
comes up in its "Visual management" lesson in the free Learn section. What
the app can do is record what the calls are about. The downtime log and the hour-by-hour board are
under Floor, in the full version, and
near-miss reports stay free. The free
Downtime poster sums up why the log matters:
Minutes are evidence. Opinions are not.