To track downtime, record every stop as it happens: when it started, when the line ran again, what caused it, and what fixed it. Then, once a week, add up the minutes by cause and sort them from largest to smallest. A few causes nearly always account for most of the lost time, and those are the ones to fix first.

Minutes lost per cause → sort largest first → share of total → running total → fix the top one

What to record for each stop

The poster's subhead is the rule behind all of this: Minutes are evidence. Opinions are not. Every site has a machine everyone "knows" is the problem. A week of recorded minutes either confirms that or points somewhere else.

Keep the reason list short

If everyone writes the reason in their own words, you can't add them up. Agree on six to ten categories that fit your area, such as waiting for material, jam, changeover overrun, breakdown, quality hold and other, and use them every time. Put detail in the fix, not in the category. If "other" grows past about a tenth of the total, look at what is in it and add a category.

A worked example: one week on a packing line

A packing line runs one shift a day, five days a week. Here is a week of recorded stops, grouped by reason. The numbers are an illustration.

ReasonStopsMinutesShareRunning total
Waiting for film (Wrapper 2)920046.5%46.5%
Film jam (Wrapper 2)148519.8%66.3%
Changeover overrun46014.0%80.2%
Label printer fault6409.3%89.5%
Conveyor photo-eye stop5255.8%95.3%
Other3204.7%100%
Total41430

Here is the arithmetic, step by step:

  1. Total minutes: 200 + 85 + 60 + 40 + 25 + 20 = 430 minutes. Total stops: 9 + 14 + 4 + 6 + 5 + 3 = 41.
  2. Share of each: divide by 430. Waiting: 200 ÷ 430 = 46.5%. Jams: 85 ÷ 430 = 19.8%. Changeovers: 60 ÷ 430 = 14.0%. Labels: 40 ÷ 430 = 9.3%. Conveyor: 25 ÷ 430 = 5.8%. Other: 20 ÷ 430 = 4.7%.
  3. Running total: add the minutes as you go down, then divide. 200 + 85 = 285, and 285 ÷ 430 = 66.3%. Add 60 to get 345, and 345 ÷ 430 = 80.2%. Add 40 to get 385, and 385 ÷ 430 = 89.5%. Add 25 to get 410, and 410 ÷ 430 = 95.3%. Add 20 to get 430, which is 100%.

Three causes out of six account for 80% of the lost minutes, and two of them are on one machine. Wrapper 2 alone is 200 + 85 = 285 minutes, two-thirds of the week. The poster's line for this is "Waiting - 3h 20m, all on Wrapper 2" is the sentence that buys a spare part. 200 minutes is 3 hours 20 minutes.

Why sorting works: the Pareto chart

Drawn as bars from tallest to shortest, with the running total as a line over them, this table is a Pareto chart. The quality pioneer Joseph Juran named the idea after the economist Vilfredo Pareto, and called the few big causes "the vital few". The split is not always 80/20, but losses are rarely spread evenly, and sorting shows you where they are.

Look at minutes and count together

Sort by minutes first, because minutes are what the customer loses. But look at the number of stops too. Jams happened 14 times, more than anything else, at 85 ÷ 14 = 6.1 minutes each. Waiting happened 9 times, at 200 ÷ 9 = 22.2 minutes each.

They need different fixes. Long, rare stops like the waiting usually point to a supply or planning gap, here film not staged at the wrapper before it runs out. Short, frequent stops like the jams usually point to the machine or the method, and a 5 Whys at the wrapper is the place to start. A problem that crosses departments, like film supply, may need an A3.

What it costs per shift

Across five shifts, 430 ÷ 5 = 86 minutes lost per shift. If the line has 435 minutes of planned production time a shift (480 minutes less 45 minutes of breaks, as in the takt time example), then it runs for 435 − 86 = 349 minutes, and 349 ÷ 435 = 80.2%. That is the availability part of OEE, worked out from recorded stops rather than from an estimate.

Fixing just the waiting would bring back 200 ÷ 5 = 40 minutes a shift. Availability would then be (435 − 46) ÷ 435 = 389 ÷ 435 = 89.4%.

Make it a weekly routine

  1. Sort last week's minutes by reason, every week, on the same day.
  2. Pick the top cause and give it an owner and a date.
  3. Check the following week whether its bar got shorter. If it didn't, the fix didn't work.
  4. Show the chart on the SPQDC board, under delivery.

Common mistakes

A free downtime poster

The Downtime poster from Lean Day Toolkit: four steps — tap to stop, walk away, tap to run, the fix.

The Downtime poster has the four steps, tap to stop, walk away, tap to run and the fix, on one A4 page. It is free to download and print, and it is one of 19 free lean posters.

Downtime in Lean Day Toolkit

Lean Day Toolkit has a downtime log under Floor → Downtime, in the full version of the app. One tap starts the clock, and you can pick where it happened and which asset. The clock is a stored start time, so it keeps counting with the app closed or the phone locked. When the line runs again, you close the event with the reason, the fix and photographs. The stop ends when you tap that the line is running again, not when you finish typing. The minutes appear on the end-of-shift report. The OEE calculator, which is one of the tools that stays free, can use the measured unplanned minutes per shift from the last week of hour-by-hour boards. The app does not draw the Pareto chart. Sort the minutes by reason yourself, as in the example above.

← All articles