A daily huddle is a short standing meeting at the team's board, at the same time every day, where the team checks yesterday against the standard, agrees today's plan, and gives every problem an owner and a date. Ten minutes is enough if the board is filled in before you start and problems are assigned at the huddle but solved afterward.
Safety → yesterday → today → actions → done, in 10 minutes
What a huddle is for
A huddle is not a status report to the boss. It has three jobs: everyone hears the same information at the same time, problems from yesterday get noticed while they are still fresh, and someone leaves owning each one. If those three things happen, the huddle worked, even if it took six minutes.
It also replaces something. Without a huddle, the same information moves through hallway conversations and phone calls all morning, and some people never hear it. Ten minutes at the board is usually cheaper than that.
Before the huddle: get the board ready
The huddle is short only when the numbers are already on the board. Before the team arrives, the team leader or supervisor:
- marks yesterday's SPQDC board green or red for each letter against its written standard,
- fills in yesterday's totals from the hour-by-hour board and the downtime log,
- checks the action list for anything due today or overdue,
- reads the shift handover notes from the shift before.
That takes about ten minutes too, and it belongs in the supervisor's leader standard work so it happens every day.
A 10-minute agenda
Example: this is a typical agenda for a team of eight to twelve people. The minutes add up to ten: 2 + 4 + 2 + 2.
| Minutes | Topic | What is said |
|---|---|---|
| 0–2 | Safety | Any injuries, near misses or hazards since the last huddle; today's safety point |
| 2–6 | Yesterday | Each SPQDC letter: green or red, and for each red, the reason in one sentence |
| 6–8 | Today | The plan, staffing, changeovers, anything unusual (visitors, trials, maintenance) |
| 8–10 | Actions | Actions due today: done or not; new actions from today's reds, each with an owner and a date |
Safety comes first every time, even on a day with nothing to report. That tells the team it matters more than output. A near miss someone mentions here is worth writing down before the huddle moves on.
Five rules that keep it to ten minutes
1. Same time, same place, standing
Hold it at the board, not in a meeting room, and don't sit down. Start on time even if someone is missing. If the start time moves, people stop coming on time.
2. Talk about reds, not greens
A green letter needs no discussion. Spend the time on the reds. The Lean Day Toolkit SPQDC
poster puts it this way: A red with a reason and an owner is a good day, not a bad
one.
3. Assign problems, don't solve them
The huddle finds out what went wrong and who will look into it. It is not where you work out the cause. "Line 2 lost 40 minutes on the labeler: Maria to run a 5 Whys with maintenance by Thursday" takes fifteen seconds. Working out the root cause in front of twelve people takes fifteen minutes and loses ten of them.
4. Every action gets one name and one date
"Maintenance will look at it" is not an action. One person, one date, written on the board where the team can see it tomorrow. If the cause turns out to be bigger than a 5 Whys, move it to an A3.
5. The team talks
The supervisor runs the huddle but shouldn't do all the talking. Ask the person who ran the station to explain its red. After a few weeks, rotate who leads it.
When there is more than one huddle
Many sites run huddles in tiers. The team huddles at its board first. Supervisors then meet at an area board and bring only what they can't fix themselves. Managers meet after that. Each tier is short and starts after the one below it, so a problem raised at 7:05 can reach someone with the authority to fix it by 8:00.
The rule for passing a problem up is the same at every tier: what happened, what has already been done, and what help is needed. Once a week, take a longer look at the patterns behind the daily reds in a weekly review.
Signs a huddle is going wrong
- It runs over twenty minutes. Problems are being solved at the board. Assign them and move on.
- The board is all green for weeks. Either the standards are too easy or nobody wants to mark red. Check the standards.
- The same red, every day. The actions aren't working, or there aren't any. Take that one to a proper problem-solving session.
- Nobody but the supervisor speaks. It has become a briefing. Ask questions instead of announcing.
- The supervisor skips it when busy. A gemba walk by the manager is a good place to check that the huddle actually happens.
The huddle board in Lean Day Toolkit
Lean Day Toolkit has an SPQDC board under Floor → SPQDC, where each of the five letters is marked green or red every day. A red asks for its reason, and offers an action with an owner and a date already filled in. The day can be printed as a page to pin up. It shows each letter with its standard, why any red was red, the countermeasures already owed, and the month so far along the bottom. The SPQDC board and the hour-by-hour board are in the full version. The action list they feed stays free.