A layered process audit (LPA) is a short yes-or-no check, done where the work happens, that the key parts of the standard are being followed, carried out on a fixed schedule by several levels of the organization. Supervisors usually check daily, managers weekly and senior leaders monthly, all using the same short list of questions. The point is not to catch people out. It is to find out, often and early, where the standard has slipped, and to fix it the same day.
Short questions × several layers × a fixed schedule = the standard, checked every day
Why several layers check the same thing
When only the quality department audits, a slipped standard can go unnoticed for months. When the supervisor checks a station every day, it gets noticed within a day. Having the plant manager do the same check once a month does two more things: the manager sees the floor as it really is, and the team sees that the standard matters to the people at the top.
The method spread through the automotive supply chain, and the industry group AIAG publishes a guideline for it, CQI-8. It works in any operation that has written standard work to check against.
How it differs from other audits
| Layered process audit | Typical system audit | |
|---|---|---|
| Length | About 10 minutes | Hours or days |
| Who | Every level, from supervisor to plant manager | Trained auditors |
| How often | Daily, weekly, monthly | Once or twice a year |
| What it checks | Is the process being run as written, today? | Is the management system documented and working? |
| Answers | Pass or fail | Findings and grades |
A 5S audit scores how well the workplace is organized. An LPA checks whether the process is being followed. Many sites run both.
Writing the questions
Keep the list to five to ten questions, each one answerable with yes or no by watching the job for a few minutes. Good questions:
- are about the steps that cause defects or injuries when they are skipped (start with your Pareto of complaints and scrap),
- can be seen, not asked about. "Is the operator following the standard?" is answered by watching two cycles, not by asking the operator,
- include one question about follow-up: were the problems found last time actually fixed?
Example: a supervisor-level list for an assembly station.
- Is standard work posted and current at this station?
- Is the operator following it, step for step?
- Are the right tools and gauges present and in calibration?
- Is material within its FIFO or FEFO sequence?
- Is defective or suspect stock segregated and labeled?
- Were yesterday's corrective actions actually closed?
Change a few questions every quarter. Once a question has passed for months, swap it for a risk that is more current, such as a new part, a recent customer complaint, or a step changed after a poka-yoke.
Setting the schedule
Example: a site with one area, one supervisor, two managers and one plant manager plans these audits in a 20-shift month:
| Layer | How often | Audits planned per month |
|---|---|---|
| Supervisor | Every shift | 20 (one per shift, 20 shifts) |
| Managers | Weekly, each | 8 (2 managers × 4 weeks) |
| Plant manager | Monthly | 2 (each at a different station) |
| Total | 30 (20 + 8 + 2) |
Rotate the stations, the shifts and the people so the same station isn't always the one audited at 8 a.m. Put the supervisor's audit in their leader standard work so it has a fixed time.
Scoring: two numbers to track
Completion: are the audits happening?
Completion = audits done ÷ audits planned
In the example month, 27 of the 30 audits were done: 27 ÷ 30 = 0.90, or 90%. A missed audit is a finding in itself. Track it by layer; if the misses are all at the manager layer, the team will notice.
Conformance: is the standard being followed?
Conformance = questions passed ÷ questions asked
The 20 supervisor audits asked 6 questions each: 20 × 6 = 120 answers. 111 passed, so conformance is 111 ÷ 120 = 0.925, or 92.5%. Look at which questions fail, not just the total. If 6 of the 9 fails are the FIFO question, that is where to dig.
What to do when a question fails
- Fix it on the spot if you can. Move the suspect stock, put back the missing gauge, re-post the right standard.
- Write it down anyway, even when fixed, so repeated fails show up.
- If it can't be fixed now, raise an action with one owner and a date, and bring it to the daily huddle.
- If it keeps failing, find the cause. A standard that is broken every week is often a bad standard, not a careless team. Use a 5 Whys or a fishbone.
Talk to the operator during the audit. Ask what makes the step hard. LPAs work when the team sees them as help, not as inspection.
Layered process audits in Lean Day Toolkit
Lean Day Toolkit has a checklist template pack for a supervisor layered process audit: six pass/fail checkpoints, described as "Daily, ten minutes, at the point of work." The example questions above are adapted from it. A checklist can be tagged with the layer that runs it, supervisor, manager or leadership, and given a schedule of daily, weekly or monthly. Scheduled checks appear on the Home screen. Checklist template packs and check schedules are in the full version.