A control chart is a run chart of one measurement with a center line and two limits worked out from the process's own past results, so you can see whether a new point is ordinary variation or a sign that something has changed. When a point lands inside the limits and the pattern looks random, leave the process alone. When a point falls outside them, or a clear pattern appears, go and find out what changed.
Limits = average ± 2.66 × average moving range (individuals chart)
Why a supervisor needs one
No process gives the same number twice. A filler puts slightly different weights into each bottle, and a changeover takes a few minutes more or less each time. If you react to every small move, adjusting the machine, retraining someone, or calling a meeting, you add variation instead of removing it. If you never react, you miss the day a real change started.
Walter Shewhart came up with the control chart at Western Electric and Bell Telephone Laboratories in the 1920s to separate those two cases. He called the everyday wobble chance causes and the signals assignable causes; W. Edwards Deming later named them common cause and special cause variation. The chart gives you a rule instead of a gut feeling.
A worked example: fill weight
Example: a bottle filler has a target of 500 g. Once an hour an operator weighs one bottle. These are ten readings from one shift. A real chart should start from at least 20 readings; ten keeps the arithmetic short here.
| Hour | Weight (g) | Moving range (g) |
|---|---|---|
| 1 | 502 | – |
| 2 | 498 | 4 |
| 3 | 501 | 3 |
| 4 | 499 | 2 |
| 5 | 503 | 4 |
| 6 | 500 | 3 |
| 7 | 497 | 3 |
| 8 | 501 | 4 |
| 9 | 500 | 1 |
| 10 | 499 | 1 |
The weight column is what the scale showed. The moving range is the difference between each reading and the one before it, ignoring the sign: hour 2 is 502 − 498 = 4, hour 3 is 501 − 498 = 3, and so on. Hour 1 has no moving range because nothing comes before it.
- The center line (the average): add the ten weights. 502 + 498 + 501 + 499 + 503 + 500 + 497 + 501 + 500 + 499 = 5,000 g. Divide by 10: 5,000 ÷ 10 = 500.0 g.
- The average moving range: add the nine ranges. 4 + 3 + 2 + 4 + 3 + 3 + 4 + 1 + 1 = 25 g. Divide by 9: 25 ÷ 9 = 2.78 g.
- The distance to each limit: 2.66 × 2.78 = 7.39 g. (2.66 is the standard constant for an individuals chart. It turns the average moving range into three standard deviations.)
- Upper control limit: 500.0 + 7.39 = 507.4 g.
- Lower control limit: 500.0 − 7.39 = 492.6 g.
Draw a line at 500.0, dashed lines at 507.4 and 492.6, and plot each new hourly reading as it comes in. As long as the weights stay between the dashed lines and wander up and down without a pattern, the filler is doing what it normally does.
When to react: three rules
Western Electric's Statistical Quality Control Handbook (1956) and, later, Lloyd Nelson's rules set out several signal patterns. Three cover most of what a supervisor needs:
1. One point outside a limit
Say the next four readings are 504, 505, 506 and 509 g. The 509 is above 507.4, so stop and ask what changed: a new batch of product, a worn valve, a different operator, or a setting someone touched. Look at it now, while the cause is still there to find.
2. A run on one side of the center line
Eight points in a row on the same side of the average is a signal even if every one of them is inside the limits. A filler that reads 501, 502, 501, 503, 502, 501, 502, 503 has shifted, and it is slowly giving product away.
3. A steady trend
Six points in a row each higher (or each lower) than the one before usually means something is drifting, like tool wear, temperature or a clogging filter. The 504, 505, 506, 509 above was already heading that way before it crossed the line.
If none of these appear, don't adjust. Changing a stable process in response to a single ordinary reading is called tampering, and it makes the spread wider.
Control limits are not specification limits
The specification (say 490 to 510 g) is what the customer or the label requires. The control limits (492.6 to 507.4 g) are what the process actually does. They answer different questions:
- Inside control limits, inside spec: stable and good. Leave it alone and look for improvements in the system, not in single readings.
- Inside control limits, but the limits are wider than spec: the process is stable and still makes bad product on an ordinary day. Reacting point by point won't fix it; the process itself has to change, through a kaizen event or an A3.
- Outside control limits: something specific happened. Find it with a quick 5 Whys at the machine.
Never draw the specification limits and call them control limits. Never set control limits by choosing numbers that look reasonable. They come from the data.
Four mistakes to avoid
- Recalculating the limits every day. Fix them from a stable baseline of 20 or more points and keep them. Recalculate only after a deliberate change to the process.
- Charting too many things. One or two measurements that matter to the customer, kept up every shift, beat ten charts nobody updates.
- Charting it in the office. The chart belongs where the work happens, so the operator sees the signal first. Put it next to the hour-by-hour board or on the team's SPQDC board.
- Plotting without writing anything down. When a point goes out, note the time and what was found next to it. A month later those notes are your Pareto chart of causes.
Other kinds of data
The individuals chart above suits one measurement at a time: a weight, a cycle time, a temperature. If you measure small groups (five parts every hour), an X-bar and R chart is the usual choice. If you count things, like defects per shift or late orders per day, there are p, np, c and u charts. The way you read them is the same: the center line, the limits, and the same three signals.
Lean Day Toolkit and control charts
Lean Day Toolkit does not draw control charts. Its stopwatch, which stays free, records cycle times at the job, and those readings are the kind of data an individuals chart is built from. See how to run a time study for how to collect them.